The modified Lauffer diagram as shown in the figure relates to roof span, RMR and stand-up time. In a metal mine, roof span of a drive is 4 m. If the RMR of the rock mass changes from 40 to 60, then the stand-up time increases by a factor of________. (round off to two decimal places)
Min: 50 Max: 70
Answer: 60
India's No. 1 test series for GATE Mining exam
© 2024-2025 examtestseries.com
All rights reserved.