Question

The selling price of one rock bolt (in Rs.) is given as, S=(20010n0.5)S = (200 - 10n^{-0.5}), where nn is the number of bolts produced. The manufacturing cost of rock bolts has a fixed component of Rs. 15000, and a variable component of Rs. 100 per bolt. The minimum break-even production, in number of rock bolts, is ______ (round off to 1 decimal place).

NAT

Min: 148 Max: 154

Answer: 151

Solutions
Add Solution

ETS

India's No. 1 test series for GATE Mining exam

Quick Links

© 2024-2025 examtestseries.com

All rights reserved.